How do you roll out a campaign? Rollout plan and release calendar
To roll out a campaign, split the release into three phases, Hype, Launch and Sustain, and give every asset a job, a channel and a date before the first post goes out. Put all of it in one release calendar the whole team works from, and set up measurement before launch. At Black Koles we write the calendar before the shoot, so the shoot makes what the calendar needs.
What is a campaign rollout plan?
A campaign rollout plan is the document that says what goes out, where, when and why. It covers every asset in the campaign, from the first teaser to the last sustain post. The release calendar is the same plan laid out by date.
It’s different from a media plan, which covers paid placements, and from a content calendar, which covers everyday posting. A rollout plan is for one campaign, and it holds owned, earned and paid together.
Crafting the message is not enough. It has to hit the right person, in the right place, at the right time. The rollout plan is where we decide that.
How to roll out a marketing campaign?
Roll out a marketing campaign in three phases, in this order.
- Hype. Build anticipation before the main piece is out. Teaser cuts, a still or two, a note to the email list and to partners. Keep it short and incomplete on purpose.
- Launch. Release the hero piece with the heaviest support of the campaign: website, email, social, paid, PR, and retail and events where they apply. All of it points at the landing page.
- Sustain. Keep the campaign showing up after launch week with supporting films, cutdowns, people and product stories, and recuts of what performed.
Force of Nature’s I Am A Force launched from its own page on forceofnature.com. The films came out on April 1, customers got the campaign by email the next day, and it ran through April and May on streaming TV, YouTube and social, with billboards in Los Angeles.
How much support each phase gets depends on the size of the campaign. A brand campaign gets everything the brand has. A small product story may get one asset across the brand’s own channels. That ranking is campaign architecture, and it should be set before you write the rollout plan.
What to include in a campaign plan?
Give every asset one row, and make every row answer the same questions. We call the sheet a campaign matrix.
- Format and channel: what the piece is and where it lives.
- Content goal: inspire, educate, entertain or convert.
- Campaign phase: Hype, Launch or Sustain.
- Customer journey stage: awareness, consideration, conversion or advocacy.
- Product and message focus: what the piece is about.
- Date and owner: when it goes out and who posts it.
If you can’t fill in a row, the asset doesn’t have a job yet. Sort that out before anyone makes it.
“They feel like an extension of our internal team. Our social media is more engaging and performant, and our content is more inspiring and heartfelt.”
What does a campaign rollout timeline look like?
Here’s a filled-in release calendar for a generic product launch with one hero film. The length and pace are an example. Yours will depend on the size of the campaign and how much you have to release.
| Week | Phase | What goes out | Where |
|---|---|---|---|
| 1 | Hype | First teaser, one still | Social, email list |
| 2 | Hype | Second teaser, launch date | Social, partners, press |
| 3 | Launch | Hero film, landing page | Website, video channel, email |
| 4 | Launch | Cutdowns, stills gallery | Social, paid social, retail |
| 5 and 6 | Sustain | Supporting films, one a week | Social, email, product pages |
| 7 and 8 | Sustain | People and product stories | Social, partners, ambassadors |
| After | Sustain | Recuts of top performers | Paid social, website |
The landing page goes live in week 3. From then on, every post, email and ad in the calendar links to it.
Hype is the shortest phase and uses the least material. Sustain is the longest and uses the most, so plan Sustain first and make sure the shoot covers it.
What goes on a campaign launch checklist?
Measurement goes first. Set up tracking before the first post goes out. Tracking added after launch can’t recover the weeks it missed, and a campaign with partial data is hard to learn from. What doesn’t get measured doesn’t get managed.
The rest of the list:
- The landing page is live, and every link goes to it.
- Each channel has a measure that fits its job: reach at the top, visits and sign-ups in the middle, sales at the bottom.
- Every asset is final, in every format the calendar calls for.
- Usage rights cover every planned placement, paid included.
- Approvals are done, and one person owns the calendar.
- Partners, ambassadors and retail accounts have their assets and their dates.
Once the campaign is live, report on a set rhythm and compare each channel to its own goal. Use what you learn in the Sustain phase: put more behind the pieces that are working and recut the ones that are close.
Force of Nature’s It’s Just Better went live in mid-November with its own landing page, a customer email and social posts, and ran on streaming TV into early January. A refresh followed in January with new cuts and carousels.
How long should a campaign keep running?
Longer than most plans allow. The common failure is releasing everything in the first two weeks and then going quiet.
The Sect’s release calendar is the public example we point to. The Sect is a gym, and for its anthem and brand refresh a three-day shoot produced an anthem film, six pillar films, member spotlights and a release schedule. That schedule kept its channels full for four months.
Sustain only works if it’s planned before the shoot. The supporting pieces have to be on the shot list, or there is nothing to release in month three. The Sect’s were. The pillar films ran in the run-up. After the anthem, a second hero film, the member spotlights and the program campaigns carried it into the new year.
How Black Koles does it.
Black Koles is a creative agency and production company in Salt Lake City. We design the campaign before anything is made, and the release calendar is part of that design. We deliver it with the creative concept, the campaign architecture and the asset map. Each piece gets a job, a channel and a date. Then the same team makes the work.
When it’s time to release, we can hand over the roadmap or run it: organic and paid, email and community, and reporting. See The Sect next. Its case study is a release calendar you can scroll: run-up, launch and long tail, from August 30 to January 7, with every asset on its date. For who we are and how we work, read about us.