How do you compare production bids? What is a triple bid?
A triple bid is when a brand, or its agency, asks three production companies to bid on the same brief, so it can compare approach and cost side by side before awarding the job. To compare the bids fairly, give all three the same brief, the same deliverables list and the same usage, then line the estimates up section by section. At Black Koles we find the lowest number is usually a different scope.
What is a triple bid?
A triple bid is a standard way to award a production: three companies bid on the same brief and one of them gets the job. It comes from the advertising business, where agencies bid three directors or production companies on a script, and many brand procurement teams now ask for it on larger jobs.
Each bidder normally sends back two things. One is an estimate. The other is an approach: a treatment, a director’s note or a call that explains how they’d make the work.
It helps to know how this looks from the bidder’s side. Bidding is usually unpaid, and a proper bid takes days of thinking. So only invite companies you’d be glad to hire, tell them it’s a triple bid, and tell the two who don’t win.
How do you make three production bids comparable?
Give every bidder identical inputs. If the inputs differ, you’re comparing three different jobs.
- The same brief, sent on the same day.
- The same deliverables matrix: every film and photo set listed with quantity, length, aspect ratios and channel.
- The same usage: where the work runs, in which territory and for how long.
- The same dates: shoot window, launch date, review time on your side.
- The same list of what you’ll supply: talent, product, locations, existing footage.
- The same budget guidance. Share a range with all three or with none.
Gregory’s relaunch shows how specific a deliverables list can get: beside the hero film came a :30 and a :15, plus a :30 each for the Rhune and Arrio packs, in vertical, 4×5, square and widescreen.
When one bidder asks a good question, send the answer to all three. And ask each to write down what the estimate assumes. An assumptions list is the fastest way to see where two bids part ways.
What do you line up side by side?
Line up the estimates by section, not by total. Put the three in adjacent columns and work down this list.
| Line | What to check | Why it differs between bidders |
|---|---|---|
| Shoot days | The count, plus prep and travel days | Each read the brief differently |
| Crew | Roles listed for each day | One bid leaves out assistants or a producer |
| Equipment | Itemized, or one “package” line | Owned gear versus outside rentals |
| Talent | Days and usage both priced | Usage left for later |
| Post | Edit days and revision rounds | Days matched to the deliverables, or guessed |
| Versioning | Every ratio and length counted | Exports assumed, not listed |
| Music | Library, licensed or scored | The scope of the license |
| Travel and hard costs | Itemized, estimated or excluded | Some bids leave them out |
| Fee, insurance, contingency | Shown as their own lines | Folded into rates, or missing |
If a line is in one bid and not in another, don’t assume it’s free in the second. Ask.
Why is the lowest bid often a different scope?
Bidders hiring the same level of crew pay similar day rates, so a big gap between bids usually comes from scope. The low bid has fewer days, fewer people, or fewer things counted.
The usual places to look:
- One fewer shoot day, or no prep day.
- A smaller crew, with one person covering two jobs.
- Travel, lodging and meals excluded, or shown as “at cost.”
- Talent or music usage not priced.
- Cutdowns and ratios assumed to come along with the hero film.
- No weather day on an outdoor shoot.
A lean plan can be the right plan, and we write them ourselves. On one field campaign our proposal said so in plain words: no dedicated camera assistant, no weather day, guides doubling as on-camera talent. That’s a fair trade when both sides can see it. It’s a problem when nobody told you.
So before you compare totals, level the bids. Ask each bidder to price what’s missing or confirm in writing that it’s included. The gap usually shrinks, and sometimes the order changes.
The high bid deserves the same check. It may include something you didn’t ask for, like an extra camera or a longer edit. Ask what it costs on its own.
What should you ask each bidder?
Ask every bidder the same short list, and ask it in writing, so you can put the answers in adjacent columns too.
- What does this estimate assume that isn’t written down?
- What’s excluded?
- If the number had to come down, what would you cut first, and what would that save?
- How are overages approved?
- Who is on the job, and are they holding our dates?
- What do we own at the end, and what does the usage cover?
- What’s the biggest risk in this job, and what’s your plan for it?
Question three tells you the most. A bidder who answers with named cuts and what each saves has thought the job through. A bidder who just offers a lower total hasn’t told you what you’re giving up.
How do you choose between three bids?
Choose on approach first, then on the leveled cost, then on the people.
The treatment tells you what film you’d get, and sometimes where. For ASSOS’s Supernatural 2.0 launch, the moodboard pointed to the lunar fields of Lanzarote, and our pitch made the case for Southern Utah’s San Rafael Swell instead. If one approach is clearly the right one, the estimate is something to work on with that company. If two approaches are close, the leveled numbers and the answers to the seven questions decide it.
You don’t always need three bids. If you have a partner you trust and the job is like the last one, a single bid with a clear estimate saves everyone time. Triple bidding helps most when the job is new, large, or has to be justified to someone who wasn’t in the room.
How Black Koles does it.
We bid from days and people. Before pricing anything we think the shoot through: who’s needed each day, what they need, and how the footage gets to post. Every estimate carries a deliverables matrix and a rights and usage block, and we write down what the plan assumes. A bid should be priced against a list that specific. If you want to see one list carried all the way through, start with It’s Just Better, Force of Nature’s fall campaign: a 60-second film, a :30, a :15 for each of its four storylines and a library of stills, all on one page. If you’re running a triple bid, read who we are, then send us the brief. If the scope isn’t settled, we’ll price it in tiers and show what changes between them.